
How Traffic Type Dictates Asphalt Thickness and Mix Design
April 6, 2026
Traffic type dictates asphalt thickness and mix design by determining the structural depth, binder grade, and aggregate properties a pavement needs to support its actual vehicle loads without premature failure. Every specification, from a 2-inch parking lot surface to an 8-inch industrial lane, traces back to the weight, frequency, and behavior of traffic on that
Read
What Are the Differences in Commercial Paving Permits Between Colorado Springs and Unincorporated El Paso County?
June 24, 2026
Commercial paving permits in the Colorado Springs area are regulated by separate agencies, portals, and codes depending on whether a project falls within city limits or unincorporated El Paso County. This guide covers permitting authorities and project types, application processes and portals, zoning and stormwater compliance, fees and inspection requirements, and seasonal and enforcement considerations.
Read
What Should Property Managers Know Before Commissioning Federally-Funded Paving in Colorado Springs?
June 24, 2026
Federally-funded paving in Colorado Springs is commercial pavement work financed through federal grant programs such as CDBG, FHWA allocations, or HUD accessibility grants, each carrying strict compliance obligations that property managers must satisfy from application through project closeout. This guide covers funding sources and eligibility, federal compliance mandates, procurement rules, climate-driven specifications, inspection and reporting
Read
Do You Need a Grading and Erosion Control Permit for Your Colorado Springs Lot Project?
June 23, 2026
A Grading and Erosion Control (GEC) Permit is a city-issued authorization required before any clearing, grading, excavation, or filling begins on a property in Colorado Springs. The permit ensures land-disturbing activities comply with municipal stormwater regulations and protect surrounding properties and waterways. This guide covers permit definitions and triggers, the application process, required erosion control
Read