
Asphalt Repair: Key Considerations Before Starting
September 6, 2025
Asphalt repair encompasses targeted techniques, such as crack filling, patching, seal coating, or resurfacing, designed to address damage or wear on asphalt surfaces without resorting to full reconstruction. These repairs are vital for preserving pavement integrity, extending its usable life, and preventing minor defects from escalating into costly replacements. According to industry estimates, the cost
Read
What Are the Differences in Commercial Paving Permits Between Colorado Springs and Unincorporated El Paso County?
June 24, 2026
Commercial paving permits in the Colorado Springs area are regulated by separate agencies, portals, and codes depending on whether a project falls within city limits or unincorporated El Paso County. This guide covers permitting authorities and project types, application processes and portals, zoning and stormwater compliance, fees and inspection requirements, and seasonal and enforcement considerations.
Read
What Should Property Managers Know Before Commissioning Federally-Funded Paving in Colorado Springs?
June 24, 2026
Federally-funded paving in Colorado Springs is commercial pavement work financed through federal grant programs such as CDBG, FHWA allocations, or HUD accessibility grants, each carrying strict compliance obligations that property managers must satisfy from application through project closeout. This guide covers funding sources and eligibility, federal compliance mandates, procurement rules, climate-driven specifications, inspection and reporting
Read
Do You Need a Grading and Erosion Control Permit for Your Colorado Springs Lot Project?
June 23, 2026
A Grading and Erosion Control (GEC) Permit is a city-issued authorization required before any clearing, grading, excavation, or filling begins on a property in Colorado Springs. The permit ensures land-disturbing activities comply with municipal stormwater regulations and protect surrounding properties and waterways. This guide covers permit definitions and triggers, the application process, required erosion control
Read