Free Quote
Call Now

New Asphalt Construction

Asphalt Coatings Company

Asphalt Coatings Company builds new commercial parking lots from the subgrade up, with drainage set before paving, concrete tie-ins and density-tested asphalt lifts.

Start your new asphalt construction quote

Construction we handle

  • New parking lot installation
  • Concrete tie-ins
  • Drainage before paving
  • Subgrade and compacted base
  • Density-tested asphalt lifts
Dump truck feeding an asphalt paver on a prepared base at a new commercial site, crew in hard hats
  • 4.7 out of 5 on Google
  • Concrete curb, sidewalk and pad tie-ins
  • Drainage set before paving
  • Density-tested asphalt lifts
  • Heavier truck and dock sections
  • Free on-site estimate
  • Since 1986

New Asphalt Construction Services

Asphalt Coatings Company provides new asphalt construction with asphalt paving, curb and gutter, concrete sidewalks, concrete dumpster pads, subgrade and base preparation and parking lot striping. Our in-house crews handle every phase, with one point of contact.

  • Asphalt paving: a roller compacting new asphalt behind the paver on a commercial drive lane

    Asphalt Paving

    We place Superpave hot mix asphalt with commercial pavers and compact each lift with vibratory and pneumatic tire rollers.

    asphalt paving
  • Curb and gutter: a new concrete curb and gutter run around a parking lot island

    Curb and Gutter

    We build curb and gutter with the paving, so elevations and transitions between asphalt and concrete stay consistent.

    curb and gutter
  • Concrete sidewalks: a crew spreading fresh concrete into new sidewalk forms

    Concrete Sidewalks

    We pour concrete sidewalks and ADA ramps alongside the asphalt work on a new construction site.

    concrete sidewalks
  • Concrete dumpster pads: a new broom-finished concrete pad and apron taped off to cure in front of a trash enclosure

    Concrete Dumpster Pads

    We recommend concrete for dumpster pads and dock areas, with asphalt for the parking field.

    concrete dumpster pads
  • Subgrade and base preparation: a graded aggregate base for a new drive lane between fresh concrete edges, ready for paving

    Subgrade and Base Preparation

    We evaluate and compact the subgrade, then place the aggregate base in lifts of 4 inches or less.

    new asphalt construction process
  • Parking lot striping: a new ADA stall with a blue accessible symbol and a hatched access aisle on fresh asphalt

    Parking Lot Striping

    We lay out stalls, accessible stalls, access aisles and signage at striping, the final activity.

    parking lot striping

The site assessment sets which of these services your new parking lot needs.

Which Properties Does Asphalt Coatings Company Build Parking Lots For?

Asphalt Coatings Company builds new parking lots for retail centers, warehouses and distribution centers, office parks, storage lots, municipal sites and multifamily communities. Residential work is not part of the service.

  • Retail and Shopping Center Parking Lots

    Asphalt Coatings Company builds retail parking lots for heavy foot and vehicle traffic.

  • Warehouse and Distribution Center Paving

    Asphalt Coatings Company builds heavier sections for truck courts and dock approaches.

  • Office Park Parking Lots

    Asphalt Coatings Company builds office park parking lots to a layout developed with you.

  • Commercial Parking and Storage Lots

    Asphalt Coatings Company builds commercial parking and storage lots around the traffic each site needs.

  • Municipal Parking Lots, Roads and Streets

    Asphalt Coatings Company builds public parking lots, roadways and streets for municipalities.

  • Apartment and HOA Community Parking Lots

    Asphalt Coatings Company paves parking lots for apartment complexes and HOA communities.

New Asphalt Construction Before and After

Our crews paved a dug-out lane beside a new concrete curb with new asphalt.

New asphalt construction before and after: a dug-out lane along a fence beside a new concrete curb, then the same lane paved with new asphalt

New Asphalt Construction Case Studies

Asphalt Coatings Company has documented new asphalt construction work at a business park and a commercial construction site.

  • Row of white stall lines on new asphalt at the edge of the Cherry Park parking lot

    Business Park Parking Lot New Asphalt Construction

    Our crews completed asphalt removal and paving and parking lot striping at Cherry Park.

    View the case study
  • Crew member wetting the gravel base inside wood and steel forms at West CenterTech

    Commercial Construction Site New Asphalt Construction

    Our crews completed concrete forming and gravel base preparation at West CenterTech.

    View the case study

View All Case Studies

New Asphalt Construction Reviews

Customers rate Asphalt Coatings Company's paving and construction work 4.7 out of 5 on Google.

1–3 of 6

  • We just had ACC re-do all of our roads within our HOA. Pretty significant project that I worked on for over two years. Finally landed with these guys and completed the project this year. They were competitively priced. They communicated extremely well from initial bidding phase, during the project and through completion. Highly recommend!

    Read moreShow less of Mike Windemuller's review
    Mike WindemullerGoogle review
  • Judson Jr and the whole asphalt crew did a great job with our commercial asphalt project. We have used them for several years to seal coat and crack fill our parking lots and every few years we mill and pave our parking lots and our only call is to ACC. We have used them for years and wouldn’t use any one else. I can’t recommend them more.

    Read moreShow less of Prince Ali's review
    Prince AliGoogle review
  • Judson Jr and his team are the best. Asphalt Coatings company has been around for over 40 years and we have been using them for many of those years. From parking lot resurfacing to Mill and Overlay Projects and annual maintenance including seal coating, crack fill, and re striping. These guys are the best and I wouldn’t use anyone else. A commitment to them is a commitment to the success and value of your property.

    Read moreShow less of Goop Master's review
    Goop MasterGoogle review
  • Delwest had Asphalt Coating's come out to one of our properties that needed some overlay and striping done on our parking lot. They were very professional and provided us with a detailed map of the area's needing work along with there professional recommendation's of the work needing done and pricing. The quality of work and time they took to finish the job was completed to our high expectations and unfortunately tight deadlines. I would highly recommend this company. Our Sales Rep. Scott Elkins was very professional and we couldn't be happier with the end results.

    Read moreShow less of Tracy Garcia's review
    Tracy GarciaGoogle review
  • Our Business Owner's Association switched to Asphalt Coatings recently, and the quality of their work has been fantastic. Not only that, Shawn has been an extraordinary educator and guide for us, helping us map out overdue repairs and long term maintenance so we can set a reliable budget. I'd highly recommend Asphalt Coatings!

    Read moreShow less of Tracy T's review
    Tracy TGoogle review
  • David and the team have been phenomenal to work with the last two years I have known them. Great communication, high quality work, and a friendly attitude has made working with him and his team an absolute pleasure. Highly recommend.

    Read moreShow less of Brian Smith's review
    Brian SmithGoogle review

Does Your Site Need New Asphalt Construction or Resurfacing?

New asphalt construction fits a site that needs a parking lot built from the ground up, while an existing parking lot usually needs resurfacing or repair.

New asphalt construction or resurfacing: a paving crew laying new asphalt as a dump truck feeds the paver

New asphalt construction fits your project if it matches one of these three conditions.

  • The site has no parking lot yet and needs earthwork, a subgrade and an aggregate base.
  • The parking lot is part of a new commercial development, paved in sequence with the general contractor.
  • The project needs asphalt and concrete built together, with full-depth asphalt or concrete from site preparation up.

Your parking lot needs a different service if it already exists and shows one of these signs.

  • The surface is worn but the base still carries load, which calls for resurfacing or mill and pave.
  • The damage is limited to localized failures, which calls for asphalt repair.
  • Asphalt Paving and Mill and Pave

    For an existing parking lot, our asphalt paving and mill and pave pages cover the resurfacing options.

  • Asphalt Repair

    Localized failures in an existing parking lot belong to asphalt repair.

How Thick Should a New Asphalt Parking Lot Be?

New asphalt parking lot thickness follows the soil conditions and the traffic each area will carry, and we specify the pavement section during the site assessment.

New asphalt parking lot thickness: a tracked paver placing a new asphalt lift on a tack-coated drive lane

We build each area of a new parking lot to one of these three sections.

  • Dumpster pads and dock areas We recommend concrete for these zones, with asphalt for the parking field.
  • Truck docks, trailer staging and loading zones We use 8 to 10 inches of compacted aggregate base and 4 to 6 inches of hot mix asphalt in multiple lifts, verified by compaction testing.
  • Visitor parking A lighter section than truck courts, dock approaches and fire lanes, set during the assessment.

Include the expected traffic and loading areas in your estimate request so the assessment covers the loads your site will carry.

More Paving and Concrete Services

Asphalt Coatings Company also provides parking lot repair and maintenance, asphalt repair, asphalt paving, mill and pave, concrete repair, concrete sidewalks, curb and gutter, concrete dumpster pads and concrete services.

Our New Asphalt Construction Process

Our new asphalt construction process runs in seven steps, from the first consultation to a final walkthrough of the finished parking lot.

New asphalt construction process: a dump truck feeding hot asphalt into the paver on a new drive lane
  1. Consultation and Planning

    We define your vision, timeline and budget and work through potential challenges with you.

  2. Site Preparation and Permitting

    We handle grading and excavation and secure the permits the site needs.

  3. Subgrade Preparation

    Where required, we stabilize and compact the subgrade to a 95% Modified Proctor target.

  4. Aggregate Base

    We place the aggregate base in lifts of 4 inches or less and compact each lift.

  5. Drainage and Grading

    We set slope, elevations and transitions before any asphalt is placed.

  6. Asphalt Paving and Concrete

    Our in-house crews place the asphalt lifts and build the concrete tie-ins.

  7. Testing, Striping and Walkthrough

    We verify density, stripe the parking lot and walk the punch list with you.

How Does New Asphalt Construction Fit the General Contractor’s Schedule?

New asphalt construction fits the general contractor’s schedule by placing the paving after grading and utilities and before landscaping, with striping and signage completed last.

We sequence the paving on a construction site in these four stages.

  1. Grading and utility work are finished before paving.
  2. Base courses can go down early as a working surface for construction traffic.
  3. The surface course waits until heavy site work is finished.
  4. Striping and signage are completed as the final activity.

We work alongside general contractors, civil engineers and utility companies, and our scope includes traffic control plans and schedule integration.

What Determines New Asphalt Construction Cost?

New asphalt construction cost depends on the site conditions, the pavement section and the work involved, and the written quote itemizes each part.

These ten factors shape the price of a new parking lot.

  • Total area The size of the parking lot sets the base quantities.
  • Excavation and earthwork Earthwork quantities change from site to site.
  • Subgrade condition Soft, wet or expansive soil needs treatment before the base goes down.
  • Aggregate base depth Base thickness follows the soil and the traffic loading.
  • Asphalt section thickness Truck and dock areas take a heavier section than visitor parking.
  • Drainage structures and grading Catch basins and slopes are set before paving.
  • Material quantities Asphalt, aggregate and concrete quantities follow the plan.
  • Site access Access shapes how equipment and trucks reach the work.
  • Traffic control Our scope includes traffic control plans where the site needs them.
  • Phasing Work phased around occupied buildings or other trades changes the schedule.

Two parking lots of the same size can cost different amounts because subgrade condition and earthwork quantities differ.

Frequently Asked Questions

These frequently asked questions cover new asphalt construction planning and layout, subgrade and base, drainage and paving, scheduling, and cost.

Planning and Layout

Does One Contractor Handle Earthwork, Paving and Striping?

Yes, Asphalt Coatings Company handles earthwork, base preparation, paving and striping with one company and one point of contact. Our in-house crews manage every phase, with no subcontractors.

Can the Concrete Be Built With the Asphalt?

Yes, our concrete services cover curb and gutter, concrete sidewalks and ADA ramps, and concrete dumpster pads alongside the asphalt work. Using one contractor keeps the elevations and transitions between asphalt and concrete consistent.

Who Develops the Parking Lot Layout?

We develop the paving and concrete layout with you and work alongside general contractors, civil engineers and utility companies. New construction lets us tailor the whole layout to the site.

How Are Accessible Stalls, Aisles and Signage Laid Out?

Accessible stalls, access aisles and signage are laid out at striping, the final activity, as part of the layout we develop with you. Our parking lot striping page covers stall and marking layout.

What Determines the Pavement Section?

Soil conditions and expected traffic determine the pavement section, which sets the aggregate base thickness, the Superpave mix and the lift thickness, together with drainage.

Subgrade and Base

How Is the Subgrade Evaluated and Prepared?

We evaluate the subgrade with a soil evaluation, a geotechnical report review, proof rolling and a drainage assessment before setting the pavement section.

When Is the Subgrade Proof-Rolled?

We proof-roll the subgrade after evaluating the soil and reviewing the geotechnical report, before setting the pavement section and placing the base.

How Is Soft, Wet or Expansive Soil Treated?

Soft, wet or expansive soil is treated with over-excavation and replacement, moisture conditioning, geotextile fabric, or lime or cement stabilization.

What Happens to Unsuitable Fill and Utility Trenches?

Unsuitable fill and buried material are excavated before the subgrade is treated and proof-rolled. Utility trenches receive compaction verification and proof rolling before paving.

What Compaction Target Is Used for the Subgrade?

Where we prepare the subgrade, excavation, moisture conditioning and compaction use a 95% Modified Proctor target, with geotextile fabric where required.

How Is the Aggregate Base Placed and Compacted?

We place the aggregate base in lifts of 4 inches or less and compact and test each lift. Base compaction uses a 95% Modified Proctor target, verified with nuclear density gauge testing, and base thickness follows the site’s soil and traffic loading.

Drainage and Paving

How Is Parking Lot Drainage Set Before Paving?

Parking lot drainage is set before paving by establishing slope, elevations and transitions while the grade is still workable.

How Are Grading and Catch Basins Coordinated?

Catch basin installation and final surface grading are part of the drainage work. We set the drainage slope in sequence with the general contractor’s schedule and verify grade before placing asphalt.

How Is the Asphalt Placed and Compacted?

We place Superpave hot mix asphalt with commercial pavers and compact each lift with steel-drum vibratory and pneumatic tire rollers.

Which Asphalt Mix Is Used for a New Parking Lot?

We place Superpave hot mix asphalt, with soil conditions and traffic loading guiding the mix and the pavement section.

How Is Compaction Tested on a New Parking Lot?

Nuclear density gauge testing verifies compaction on the subgrade, the aggregate base and each asphalt lift.

What Happens at the Final Walkthrough?

The final walkthrough is a punch-list review with you and the general contractor after surface grading and the striping layout are complete. Every project gets a quality check before it is handed over.

Schedule

How Long Does New Parking Lot Construction Take?

New parking lot construction generally takes a few weeks to several months, depending on the size, scope, weather and permitting process.

What Can Change the Construction Schedule?

Weather and permitting are the main factors that can move a construction date. Paving needs warm, dry weather, so rain, cold or high humidity can push a date, and we coordinate the timeline with the general contractor.

Does Site Preparation Include Permitting?

Yes, our site preparation includes securing the permits the project needs, along with grading and excavation.

Can Work Be Scheduled Around Occupied Buildings?

Yes, the work can run at night, on weekends or in phases around occupied buildings. Our in-house crews help meet the project schedule and adapt to field changes.

Cost and Contractors

Why Can Two Same-Size Parking Lots Cost Different Amounts?

Two same-size parking lots can cost different amounts because subgrade condition and earthwork quantities differ from site to site. The free written quote sets out the scope and itemized pricing after the site assessment.

What Should You Compare Between Parking Lot Construction Contractors?

Compare how each parking lot construction contractor reads take-offs, manages new construction sites and handles field changes. Asphalt Coatings Company has served commercial clients since 1986, with in-house crews and company-owned equipment.

How Do You Care for a New Asphalt Parking Lot?

A new asphalt parking lot stays in good condition with regular upkeep after construction. Our parking lot maintenance and sealcoating pages cover that care.

Which Areas Does Asphalt Coatings Company Serve?

Asphalt Coatings Company runs its work from three offices, in Denver Metro, Colorado Springs and Fort Collins, and its crews also work across the cities listed below.

More cities we serve

Send your job site address with the form and we'll confirm it's in our service area.

How Your Free New Asphalt Construction Quote Works

A free new asphalt construction estimate or quote starts with one step from you: send your job site address and project details with the form.

After you send the form, the estimate follows these three steps.

  1. You can upload plans, take-offs or a geotechnical report with the form.
  2. A project manager visits the site and reviews the conditions.
  3. You receive a written scope with the pavement section specification, itemized pricing, project schedule and traffic control plan, coordinated with your general contractor.

The estimate costs nothing and carries no obligation.

To talk it through first, call the office nearest you, Monday to Saturday from 7:30 AM to 5:00 PM, or email info@asphaltcoatings.net.

Call NowEmail info@asphaltcoatings.net

Monday to Saturday, 7:30 AM to 5:00 PM

For commercial properties only, including HOA, multifamily and municipal sites.

You receive a written scope with itemized pricing before any work begins.

Send your job site address with the form and we'll confirm it's in our service area.

What do you need? Required. Choose one or more.
Add details: company, notes and photos
0 / 180
Photos or files (optional)

    Free on-site estimate. No obligation.