Crosswalk and Road Striping at Denver Neal Training in Centennial

Free Quote
Call Now

Crosswalk and Road Striping at Denver Neal Training in Centennial

  • Centennial, CO
  • Training complex access road

Asphalt Coatings Company striped the new access road at Denver Neal Training in Centennial, painting crosswalks at its intersections, right-turn arrows and a long hatched zone along the grandstand curb. Every marking sits on dark, new asphalt, and traffic cones still stood at several crossings when the photos were taken.

Property
Training complex access road
Services
  • Crosswalk striping
  • turn arrows
  • hatched curb zone
Location
East Fremont Avenue, Centennial, CO
Photos on file
9

What the crew painted

The markings guide drivers and walkers along a road that runs past a grandstand, practice fields and warehouse buildings.

  • Crosswalks

    Wide white bars mark a crosswalk at each intersection and entrance along the road.

  • Turn arrows

    A white right-turn arrow sits in the turn lane ahead of the stop sign.

  • Lane lines

    A solid white line divides the turn lane from the through lane, next to the yellow center line.

  • Hatched curb zone

    By the grandstand, diagonal hatching fills the strip between the curb and a long edge line.

Crosswalks at every crossing

Crosswalks went down at the road's entrance, at a four-way intersection and at the side road facing the warehouses. Each one lines up with the curb ramps on either side of the road.

Where

DenverCastle Rock

South Metro

East Fremont Avenue, Centennial, Colorado

See ACC services in Centennial

Request a free quote for crosswalks, arrows and lane lines on a new road or lot in Centennial.